Report PDF
Posted Date
Size
Cultural Resource Assessment Survey (CRAS)
01/29/2013
54.5 mb
Contamination Screening Evaluation Report (CSER)
05/23/2017
30.2 mb
Conceptual Stage Relocation Plan (CSRP)
01/29/2013
2.6 mb
Determination of Section 4(f) Applicability (DOA)
01/29/2013
28.5 mb
Environmental Assessment/Finding of No Significant Impact (EA/FONSI)
05/23/2017
22.7 mb
Endangered Species Biological Assessment (ESBA)
05/23/2017
3.2 mb
Location Hydraulic Report (LHR)
05/23/2017
34.0 mb
Noise Study Report (NSR)
06/22/2017
15.0 mb
Preliminary Engineering Report (PER)
06/19/2017
142 mb
Pond Siting Report (PSR)
05/23/2017
208 mb
SWFWMD L-63N Canal Section 4(f)
01/29/2013
2.1 mb
SR 710 Case Study
01/29/2013
37.1 mb
SR 710 Traffic Technical Memorandum
01/29/2013
75.7 mb
Wetland Evaluation Report (WER)
05/23/2017
97.7 mb
Section 106 Case Study Report
05/23/2017
37.3 mb
Wood Stork Biological Assessment
05/23/2017
32.7 mb
Audubon’s Crested Caracara Species Specific Survey
05/23/2017
10.4 mb
Section 4(f) De Minimis Determination
05/23/2017
23.1 mb
Comments & Coordination (C&C) Report
05/31/2017
146 mb